Resumen de contenidos para Westinghouse Industrial
Página 1
ETL-ES-IndustrialWC-WH14 OWnEr'S ManuaL ManuaL dEL uSuarIO Industrial Please write model number here for future reference: / Por favor, incluya el número del modelo aquí para futura referencia: Net Weight: 14.08 LBS Peso Neto: 6.4 KGS...
ETL-ES-IndustrialWC-WH14 SafETy TIPS OBSERVE THE FOLLOWING: READ AND SAVE THESE INSTRUCTIONS WARNING: TO REDUCE THE RISK OF FIRE, ELECTRIC SHOCK, OR PERSONAL INJURY, MOUNT TO OUTLET BOX MARKED 'ACCEPTABLE FOR FAN SUPPORT OF 15.9 KG (35 LBS) OR LESS' AND USE MOUNTING SCREWS PROVIDED WITH THE OUTLET BOX AND/OR SUPPORT DIRECTLY FROM BUILDING STRUCTURE. MOST OUTLET BOXES COMMONLY USED FOR THE SUPPORT OF LUMINARIES ARE NOT ACCEPTABLE FOR FAN SUPPORT AND MAY NEED TO BE REPLACED.
ETL-ES-IndustrialWC-WH14 COnSEjOS dE SEgurIdad HAGA LO SIGUIENTE: LEA Y GUARDE ESTAS INSTRUCCIONES ADVERTENCIA: PARA REDUCIR EL RIESGO DE INCENDIO, DESCARGA ELÉCTRICA O LESIONES PERSONALES, MONTE EN UNA CAJA DE EMBUTIR ROTULADA “ADECUADA PARA VENTILADORES DE 15,9 KG (35 LB) O MENOS” UTILIZANDO LOS TORNILLOS DE MONTAJE INCLUIDOS CON LA CAJA DE EMBUTIR Y/O MONTE DIRECTAMENTE EN LA ESTRUCTURA DEL EDIFICIO LA MAYORÍA DE LAS CAJAS DE EMBUTIR UTILIZADAS NORMALMENTE CON ARTEFACTOS DE ILUMINACIÓN NO SON ADECUADAS PARA VENTILADORES Y DEBERÍAN SER REEMPLAZADAS.
ETL-ES-IndustrialWC-WH14 PrEParIng fOr InSTaLLaTIOn anTES dE La InSTaLaCIón Use metal outlet box suitable for fan support (must support 35 lbs). Before attaching fan to outlet box, ensure the outlet box is securely fastened by at least two points to a structural ceiling member (a loose box will cause the fan to wobble).
Página 5
ETL-ES-IndustrialWC-WH14 MOunTIng braCkET InSTaLLaTIOn InSTaLaCIón COn SOPOrTE dE MOnTajE Remove the screws and star washers from the two mating holes (1) on the canopy. Loosen (do not remove) the screws in the mating slots (2) on the canopy. Rotate the mounting bracket and remove from the canopy. Quite los tornillos y las dos arandelas en estrella de los dos orificios coincidentes (1) del dosel.
Página 6
ETL-ES-IndustrialWC-WH14 MOunTIng braCkET InSTaLLaTIOn MOunTIng OPTIOnS InSTaLaCIón COn SOPOrTE OPCIOnES dE MOnTajE dE MOnTajE Choose a MOunTIng OPTIOn Elija una OPCIón dE MOnTajE nOrMaL dOWnrOd OPTIOn If installing downrod supplied with fan, proceed to page 12, step 13. OPCIón COn VarILLa VErTICaL Para CIELOrraSO nOrMaL Si instala la varilla vertical incluida con el ventilador, proceda a la página 12, paso 13.
Página 7
ETL-ES-IndustrialWC-WH14 EXTEndEd dOWnrOd OPTIOn OPCIón COn VarILLa VErTICaL MÁS Larga Loosen set screws on the lower canopy (1). Lift up the lower canopy, take out the cotter pin (5), unloosen and remove the lock washer (3) , the nut (4), the cross pin (6) from the yoke (2), and keep all of them for future usage, take out the down rod from the yoke and canopy.
Página 8
ETL-ES-IndustrialWC-WH14 EXTEndEd dOWnrOd OPTIOn OPCIón COn VarILLa VErTICaL MÁS Larga Slide downrod ball (1) off of downrod and remove pin (2). Deslice la esfera de la varilla vertical (1) hasta separarla de la Loosen downrod ball (1) from downrod (2) by removing set screw (3). varilla vertical y quite el pasador (2).
Página 9
ETL-ES-IndustrialWC-WH14 EXTEndEd dOWnrOd OPTIOn OPCIón COn VarILLa VErTICaL MÁS Larga Re-install pin into extended downrod, and slide downrod ball up to the top of the downrod. Re-install set screw to secure ball to downrod. Note: Some extended downrods have a pre-drilled set-screw hole. If a pre-drilled hole is present in the extended downrod, tighten the set screw into the pre-drilled hole in the extended downrod.
Página 10
ETL-ES-IndustrialWC-WH14 EXTEndEd dOWnrOd OPTIOn OPCIón COn VarILLa VErTICaL MÁS Larga Thread leadwires through the downrod and install crosspin (1) through yoke (2) and downrod. Install lockwasher (3) and nut (4) and tighten. Loosen set screws on the lower canopy (1). Install canopies onto downrod as Install cotter pin (5).
Página 11
ETL-ES-IndustrialWC-WH14 EXTEndEd dOWnrOd OPTIOn OPCIón COn VarILLa VErTICaL MÁS Larga Aim the reverse switch on the yoke to the reverse switch hole in the lower canopy. Side the lower canopy down, make sure there is at least 1/4” clearance maintained between the motor and lower canopy bottom and position the reverse switch properly.
ETL-ES-IndustrialWC-WH14 MOunTIng MOnTajE Carefully lift fan assembly onto mounting bracket. Rotate fan until notch on downrod ball (1) engages the ridge on the mounting bracket (2). This will allow for hands free wiring. With bracket holding fan assembly, make electrical connections using the Levante con cuidado el conjunto del ventilador hasta el soporte de montaje.
Página 13
ETL-ES-IndustrialWC-WH14 WIrIng OPTIOnS OPCIón dE CabLEadO WaLL COnTrOL WIrIng OPTIOn Follow diagram above to make wiring connections for wall control operation. OPCIón dE CabLEadO Para COnTrOL dE ParEd Siga las instrucciones del diagrama anterior para hacer las conexiones de cableado para el ventilador con control de pared.
ETL-ES-IndustrialWC-WH14 SECurE TO CEILIng aSEgurE EL VEnTILadOr aL CIELOrraSO For downrod fans, slide the canopy up to the mounting bracket. The canopy has two mating slots (1) and two mating holes (2). Position both slots on canopy directly under and in line with two screws in the mounting bracket (3). Lift the canopy, allowing the two screws and star wahers to slide into the mating slots. Rotate the canopy until both screws from the mounting bracket drop into the slot recesses.
Página 15
ETL-ES-IndustrialWC-WH14 bLadE InSTaLLaTIOn InSTaLaCIón dE LaS PaLETaS Install blades to top of motor using screws and washers . See above drawing for reference. Instale las paletas en la parte superior del motor con la tornillería. Utilice la ilustración anterior como referencia.
Página 16
ETL-ES-IndustrialWC-WH14 InSTaLLIng and WIrIng THE WaLL COnTrOL InSTaLaCIón y CabLEadO dEL COnTrOL dE ParEd Wiring the wall control. 1. Connect the Black wire marked with “AC IN L” from the wall control with the black wire from A. C. supply. 2.
Página 17
ETL-ES-IndustrialWC-WH14 Operations: Secure the face panel and wall-mounted control to the out- let box with two screws provided. 0: Fan Speed OFF 4: Fan Speed HIGH Asegure el panel delantero y el control montado en la pared 3: Fan Speed MEDIUM HIGH a la caja de embutir usando los dos tornillos provistos.
ETL-ES-IndustrialWC-WH14 OPEraTIOn and MaInTEnanCE Operation Turn on the power and check operation of fan. Speed settings for warm or cool weather depend on factors such as room size, ceiling height, number of fans and so on. The slide switch controls direction, forward or reverse. Warm weather/down position - (Forward) Fan turns counterclockwise direction.
ETL-ES-IndustrialWC-WH14 OPEraCIón y ManTEnIMIEnTO Operación Encienda el ventilador y verifique su funcionamiento. Las velocidades para clima cálido o frío dependen de factores como el tamaño de la habitación, la altura del ventilador, el número de ventiladores, etc. El conmutador de tipo deslizante controla la dirección, hacia adelante o hacia atrás. Clima cálido/posición hacia abajo - (Adelante) El ventilador gira en sentido contrahorario.
ETL-ES-IndustrialWC-WH14 If you have difficulty operating your new ceiling fan, it may be the result of incorrect assembly, installation, or wiring. In some cases, these TrOubLESHOOTIng guIdE installation errors may be mistaken for defects. If you experience any faults, please check this Trouble Shooting Chart. If a problem cannot be remedied, please consult with your authorized electrician and do not attempt any electrical repairs yourself.
ETL-ES-IndustrialWC-WH14 Si tiene dificultades para hacer funcionar su nuevo ventilador, podría ser a causa del armado, instalación o guía Para SOLuCIOnar PrObLEMaS cableado incorrectos. En algunos casos, estos errores de instalación podrían ser confundidos con defectos. Si experimenta alguna falla, consulte esta guía para solucionar problemas. Si no puede solucionar el problema, consulte a un electricista autorizado y no intente reparar conexiones eléctricas.