Installation Instructions - septodont SYG-200 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 9
4) Noise level: ≤65dB
5) Time setting: 01s-99s
6) Intermittent cycle: 3mins running @1mins stopping
7) Overvoltage category: Class II
8) Enclosure: IPX0
9) Operating conditions
Temperature: +10
Ambient pressure 850 hPa to 1060 hPa
10) Storage and transport conditions
Temperature: -10
Ambient pressure 500 hPa to 1060 hPa

4. Installation instructions

1) Take the main unit out of the packaging box, turn the bottom up, and place it on the
desktop with a protective pad. As shown in Fig.2, remove the four red shipping screws
with a screwdriver.
2) Turn the main unit upside down and place on a flat table.
3) Connect the power supply to the main unit, and the other end to the power source.
~ +40
; Relative Humidity: 10% to 90%
~ +40
;
Relative Humidity: 10% to 90%
Fig 2
- 3 -

Publicidad

Tabla de contenido
loading

Productos relacionados para septodont SYG-200

Tabla de contenido