Descargar Imprimir esta página

OMCR B01.16 Manual De Instrucciones página 8

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

3.5
WARNING
Pic.2
3.6
WARNING
CONSTRUCTOR
8. Use and maintenance manual B01.16 - B02.30
Before each lifting, handling or overturning of the die be sure about the correct insertion
of the lifting pin that has to be ABSOLUTELY assembled with the safety ring positioned
in direction of the die axis: after inserting it, be sure that the safety ring is misaligned in
reference to the hole so that the pin accidental extraction is avoided; check the movement
of the safety ring by verifying the eccentricity "E" in reference to the pin (see Pic.2).
Before each lifting, handling or turnover check that the lifting brackets capacity load is in
compliance with the die weight; the maximum capacity load, the work order number, the
constructor label and the EC conformity mark are indelibly marked on the lifting pins and
over the lifting brackets. NOTE: the work order numbers of lifting brackets and pins are not
necessarily corresponding (see Pic.3).
PRODUCT CODE
Pic.3
LIFTING
LIFTING PIN
BRACKET
ART. NUM.
ART. NUM.
B01.16.4000
B01.16.6300
EC MARK
LIFTING PIN MARK
MAXIMUM CAPACITY LOAD
San Maurizio C.se - 16/12/2020
B02.30.
B02.30.
www.omcr.it

Publicidad

loading

Productos relacionados para OMCR B01.16

Este manual también es adecuado para:

B02.30