In case of lifting and handling, the lifting bracket capacity load should be at least 1/2 of the whole die weight.
(upper half-die + lower half-die).
Example: Die weight 8.000 kg - minimum lifting bracket capacity load: 8.000 / 2 = 4.000 kg
In case of half-die overturning the lifting bracket capacity load should be at least 1/2 of the half-die weight.
Example: Half-die weight 4.000 kg - minimum lifting bracket capacity load: 4.000 / 2 = 2.000 kg
3.7
WARNING
3.8
WARNING
Pic.4
3.9
WARNING
9. Use and maintenance manual B01.16 - B02.30
Before each lifting, handling or overturning of the die, check that the chosen sling system
(rope/chain, hook, etc.) doesn't present any defect or deformation to make it unsafe;
otherwise replace immediately the damaged parts.
To prevent the pin accidental extraction, don't make lifting, handling or overturning with sling
angle bigger than 90° from the horizontal level (see Pic.4).
DIE AXIS
Before each lifting, handling or overturning of the die be sure that:
the ropes / chains are secured in correct way;
the ropes / chains are not in contact with cutting edge;
the ropes / chains are not hooked to the die corners.
DIE AXIS