Descargar Imprimir esta página

BENIFERRO ZWMX7525-P Manual De Instrucciones página 6

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 90
○ The product must be installed indoors. If you want to do this outdoors, you should contact
your supplier.
○ The dosing units should not be used with hydrochloric acid (HCl).
○ Acid and chlorine (liquid chlorine) should not be mixed. When mixed, chlorine gas is formed.
Storage must be carried out in such a way that the products cannot come into contact with
each other. (HCl)
○ The electronics of the unit (dosing units) must be installed indoors. Make sure that the
water cannot run over the unit in case of leakage.
○ Never connect the electronics or the device itself to an output of a frequency converter.
Chlorine and acid can react with each other and form chlorine gas. Make sure that the
chemicals are outside and that they cannot come into contact with each other.
○ The dosing unit shall not be in the same circuit as the frequency converter used and shall be
at least 3 m away from the dosing unit.
○ Calibrate the pH and Rx electrodes before first use and then "regularly".
Installation of the water treatment panel
1) Attach the water handling unit to a solid wall. Attach both the lower and upper part of the
panel.
2) Place the pH and chlorine electrodes in the electrode holders. Tighten the nut with pliers or a
wrench to tighten the cap. If you do not do this, there is a chance of a leak that is not covered
by the warranty.
6

Publicidad

loading

Este manual también es adecuado para:

Zwmx7526-pZwmx7528-p