Descargar Imprimir esta página

BENIFERRO ZWMX7525-P Manual De Instrucciones página 7

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 90
3) Connect the water inlet and outlet in such a way that the water first passes along the pH
dosing cap and the pH measuring electrode and then along the redox measuring electrode and
the redox dosing cap. (according to the direction of the yellow arrows on the pipe) The default
setting is an installation in the bypass configuration:
4) Adjust the electrical connections so that
- The chlorine and acid pumps cannot work if the filter pump does not work, via the menu item
Flow switch (on).
- Of chlorine- in acid pumps can become disabled when of filter pump in action is.
Filter pump
Fuse with
timer
Turn off the acid and chlorine dosing unit (button at the bottom left of the dosing pumps) for
the next steps during installation and calibration.
5 Connect the pH and redox measuring heads to the BNC connector at the designated points at
the lower left of the control unit:
7

Publicidad

loading

Este manual también es adecuado para:

Zwmx7526-pZwmx7528-p