7. USE
SETUP
Insert the shoe most suitable to the welding to carry out around the
extrudate hose.
SHOE REPLACEMENT
It must be carried out when the extruder is still hot.
WARNING!!!: this operation involves the risk of burns and
must be completed by the operator only wearing heat-
resistant protective gloves.
BURN HAZARD
C
D
•
Lose screws F and D.
•
Take off the shoe support B.
•
Unscrew C and remove shoe A.
•
Mount a new shoe A on support B.
•
Mount again B on the extrudate hose.
•
Tighten screws F
•
Tighten D to fix the shoe position or keep it lose to let it turn around
the extrudate hose.
MAINS CONNECTION
Plug into the mains. Power generators require a voltage stabilizer.
Extensions require the minimum cable sections below.
EXTENSIONS (230 V)
Max length [m]
19
20 ÷ 50
2
Cable section [mm
] 2,5
4
**STARGUN**
F
A
B
F
V1.2
WARM UP
PREHEATING
PLEASE WAIT 400
Wait for the extruder to warm up.
Note
The extruder is equipped with a safety system that disables the motor if:
•
the minimum working temperature has not been reached;
•
a new set point, that is greater or lower than 10°C, has been typed in.
Once the heating time has been elapsed (READY!), the hand extruder is
ready to start.
278
The temperature of the melting chamber changes as the air temperature of
the blower changes.
AIR TEMPERATURE SETTING
Hold button 2 pressed for 3 sec. Use buttons 2 and 3 to set the air
temperature within the range Tmin=250°C – Tmax=365°C.
The new setting point is stored after 5 sec. The temperature of the air is
stored since the last usage.
280
2
3
Working temperature
Please refer to standard DVS 2207-4.
READY!
CHANGE
EN
15