Descargar Imprimir esta página

Kohler K-16109 Guia De Instalacion página 5

Grifería para fregadero
Ocultar thumbs Ver también para K-16109:

Publicidad

Idiomas disponibles

Idiomas disponibles

Valve Inlet
Supply
Nut
Tube
Supply
Stop
3. Supply Installation
- Slip the ground joint nut onto the supply tube.
- Carefully position the round end of the supply tube squarely to the
valve inlet and supply stop.
- Tighten all nuts.
4. Installation Checkout
- Make sure the faucet handles are in the off position.
- Turn on the main water supply (not the faucet), and check for leaks.
- Remove the aerator.
- Turn on the hot and cold faucet handles and run the water for about
a minute to remove any debris.
- Check for leaks.
- Turn the water off, and reattach the aerator.
Kohler Co.
Aerator
Chamber
Assembly
5
Washe
r
Aerator
Body
A
1004636-2-

Publicidad

loading

Este manual también es adecuado para:

K-16111