Descargar Imprimir esta página

SMA SB3.0-1SP-US-40 Instrucciones De Servicio Técnico página 11

Ocultar thumbs Ver también para SB3.0-1SP-US-40:

Publicidad

Idiomas disponibles

Idiomas disponibles

10. If necessary, remove residual insulation material
from the two connection openings at the top of the
Connection Unit.
5
Mounting the New Power Unit
Procedure:
1. Disconnect the inverter from voltage sources (see inverter manual).
2. Hook the new Power Unit into the upper recesses of the wall mounting bracket, thus plugging
the Power Unit into the Connection Unit. Make sure that the screw holes on the left and right
sides of the Power Unit are directly over those of the Connection Unit; and the cables
protruding from the Power Unit must not be pinched.
3. Tighten 2 screws with 2 washers on the right and left side of the Power Unit (TX25) (torque:
6 Nm ± 0.3 Nm (53 in-lb ± 2.65 in-lb)).
4. If the enclosure lid of the new Power Unit is a
transport lid (see information on the enclosure lid),
replace the transport lid of the new Power Unit with
the enclosure of the defective Power Unit. To do so,
loosen all screws of the upper enclosure lid (TX25)
and remove it.
5. Position the upper enclosure lid with the 6 screws
and serrated conical spring washers on the
enclosure and tighten it in the specified order (TX25,
torque: 6 Nm (53 in)).
6. Secure the inverter to the wall mounting bracket. To
do this, insert the screw M5x60 through the hole on
the left side of the Power Unit and screw it into the
thread (TX25, torque: 1.7 Nm ± 0.3 Nm (15.05 in-
lb ± 2.65 in-lb)).
Service Manual
5 Mounting the New Power Unit
1
6
3
5
SBxx-1SP-US-40-AT-PU-SG-xx-13
4
2
11

Publicidad

loading