Installation And Working Procedures - Ega Master 55815 Manual De Instrucciones

Cortatubos biselador eléctrico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

make it easier to be connected to the pipes. The mainframe has been preset and adjusted by the
factory.
TOOL SLIDE
Our products standard tool slide of one level.
SWELLING BLOCK
Necessary part for cutting and beveling process of different types and sizes pipes.
DRIVING MOTOR
Electric motor
HAND TOOLS
Each cutting and beveling machine is supplied with hand tools(including tool bits) for
setting and operating.
1. Remove the mainframe from wooden case.
Caution: if the model of the machine is above 450mm, please use more workforce or plenty tools, such as
rope to remove the mainframe lest it causes injury to operators or damage to machines.
2. Slide the Lock Pin into the Circular Ring
This pin can prevent the Circular Ring from loosening when the machine is opened for series working.
3. Install Tool Slide
A. Six holes and four Lock Pins in two lines on the back of the Tool Slide. Lock Pins are used for setting
position, three holes represent possible installing position: high, mediate and low position.
B. Slide Pins into proper hole.
C. Screw down four M8 Inner Hex Screws and fix the Tool Slide on the Rotating Ring.
4. Screw down three M8 Inner Hex Screw and install Link Mechanism.
Caution: set up one or two extending blocks as per the given scope.
Caution: the Link Mechanism is properly installed, feed link should be pull out in separate positions.
5. Install cutting and beveling Tool Bits in a proper position on the Tool Post.
6. Install Tool Post cover plate to fasten Tool bit position.
Screw down the four Inner Hex Screws on each Tool Post Cover Plate.
Caution: the distance between Tool Slide Cover Plate should be the same on both sides of the cutting Tool
Bits.
7. After installing the Tool Slide Cover Plate, screw down two Inner Hex Screws in the center of the cover
plate.
8. Measure the external diameter of pipes to see whether the Swelling Block is needed, if needed, select
proper one and install it( refer to the ● SECTION of Swelling Block selection). If just for cutting and connecting
pipes, come directly to Step 11 for cutting process, otherwise come to Step 9.
9. Regarding beveling work piece: Slide the mainframe to the end. The lift equipment like "Lifter" may be
required for it.
Caution: when installing the machine on the pipes, make the clearance between drive motor and link
mechanism convenient for use.
10. Come to Step 12.
11. Connecting process.
A. Loosen all Lock Screw on the ring.
B. Separate the machine into halves. Make them equal to avoid conglutinating.
C. Install the upper half ( the one with pinion) to the top of the process pipe.
D. Install the other half to the bottom of the process pipe, jointing two parts with Locating Dowel.
E. Tighten one Lock Screw on the Rotating Ring, and then tighten another Lock Screw to joint the rings
quickly and effectively.
Caution: tighten all the screws carefully to avoid damage to mainframe.
18

5.2 INSTALLATION AND WORKING PROCEDURES

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido