3.
Pour 6" of gravel into bottom of both holes and
insert posts. Add concrete to rst post hole
according to manufacturers instructions to top
of hole (Fig. 4). Ensure rst post is plumb and
level. Let concrete set making sure panel will be
2" above ground. Do not add concrete to second
hole until later in installation.
4.
When included in kit, place aluminum insert into
bottom rail, then insert bottom rail into bottom
post route hole of rst post only. Panels with 7"
rails do not require aluminum inserts (Fig. 5).
5.
Attach U-channels to two end boards (Fig. 6).
NOTE:
Attach U-Channel to "tongue" side of rst board,
and "goove" side of last board.
4
Fig. 4
Post
Concrete
Gravel
Fig. 5
Fig. 6
U-Channel
First
Board
Last
Board
U-Channel