STEP 4 (Figure 4, Figure 6)
Connect the straight arm to the bent arm with the bolt.
Position and bolt the arms to the top edge of the door using
the bolt supplied
STEP 5
Lift the garage door until the shuttle locks into the drive
chain/belt.
Now, ready to program the openers.
Sectional Steel Track Assembly
2 Parts Steel Track
A: 1500mm
3 Parts Steel Track
C: 1000mm
Sleeve
D: 1000mm
Sleeve
7
B: 1500mm
Figure 7
E: 1000mm
Sleeve
Figure 8
Figure 6
Keep Working