Current values "LOOP 1"
Current value
Current flow
Current heat power
Alternate current tempera-
ture hot and cold side in 2
s cycles
Temperature difference
Previous month's values "LOOP 2"
Previous month's values
Log date
Energy quantity and
volume on reference
date
Missing time on set day
Max. flow on set day in
2 s cycles with date
stamp
General/Communication "LOOP 3"
General/Communication
Device number,
7-digit
Optional interface
Primary address (only
for M-Bus)
Secondary address
7-digit - for M-Bus
Other "LOOP 4"
Other
Date
Time
4.1
Monthly values
The meter stores the following values for 24 months on the
monthly set day
•
Missing time
•
Volume
•
Energy
and the maxima with date stamp for
•
Flow
•
Power
•
Temperature hot side
•
Temperature cold side
4.2
Parameterisation
When the LCD displays the code entry, you can call up the
parameterisation operation by inputting the code. You can set
date and M-Bus primary address in the parameterisation oper-
ation for example. For more detail see separate parameterisa-
tion instruction.
Siemens Building Technologies
5.
For activation proceed as follows:
•
Mounting place here:
•
hot side, changeable;
optional)
•
Operating time with flow
The message "F0" disappears after 10 sec.
Operating time with flow
•
Time with flow
•
•
•
Error messages for incorrect installation:
Max. power in 2 s cycles
with date stamp
Max. temperature hot
side in 2 s cycles with
date stamp
Max. temperature cold
side in 2 s cycles with
date stamp
6.
Yearly set day
If the respective operation thresholds are exceeded and flow
and temperature difference are positive, the meter summates
Monthly set day
the energy and the volume.
Firmware version
For a positive flow the activity display
CRC-Code
loop in the LCD.
All segments of the display are switched on for control purpos-
es during the segment test. The flow, power and temperature
difference are recorded with the appropriate +/- signs.
The operating hours are counted from the first connection of
the power supply. The meter saves "operating time with flow"
Code entry for test /
as soon as a positive flow is recognised. Missing hours are
para operation
summated if there is a fault and the meter is thus unable to
take a measurement.
Stored maximum values are marked with an "
right hand area of the LCD.
Getting Started
Open the slide valves slowly.
Check the heating system for leak-tightness and bleed air
out carefully.
Press the button on the meter briefly.
Check the measured values for flow and temperatures for
plausibility.
Vent the heating system until the flow display is stable.
Fit the user locks to the fittings and the temperature sen-
sors. The scope of supply includes two self lock seals for
sealing a sensor and the connecting fitting.
Read the meter status for energy, volume, operation and
missing time and note the values.
Error "incorrect flow direction (negative)"
Check that the flow direction arrows on the volume measurement unit
match the flow direction of the system. If the directions do not match,
turn the volume measurement unit through 180°.
Error "negative temperature difference"
Check whether the sensors are installed correctly. If the sensors are
not installed correctly, change the installation position of the sensors.
Heating meter:
Temperature sensor in the flow-pipe with higher temperatures; temper-
ature sensor in return-pipe with lower temperature
Cooling meter:
Temperature sensor in the flow-pipe with lower temperatures; tempera-
ture sensor in return-pipe with higher temperature
Functional Details
If the operate margin is gone below a "u" is displayed at a leading
point for the flow, power and temperature display.
CE2U5372xx
appears in the user
" in the lower
22.06.2020 12