STEP 4 - INSPECTION OF THE OSMOSIS UNIT INSTALLATION
1. After connecting the hoses of the entire osmosis unit and confirming that they are
correct, open the ball valve for the water supply and turn on the power supply to
operate and perform the final inspection before installing the entire osmosis unit.
2. The ratio of pure water to wastewater effluent can be visually observed during
tests. Under normal circumstances, the ratio is 1.5:1.
NOTICE
When the osmosis unit starts operating for the first time, it must be thoroughly rinsed
for one minute.
3
1
Filter replacement reminder
2
Breathing light
3
Function button
4
TDS value
5
Operation indicator
1
2
4
5
1
2
1
Water inlet
2
Drainage water outlet
3
Filtered water
4
Pure water
5
DC interface
6
Smart tap interface
28
3
4
5
6
EN