PREPARE THE AIR CONDITIONER
3
(continues)
Remove the ground screw from the left side of
E
the case. Keep it in a safe location. NOTE: Be
sure to save this screw. You will need it later
in the installation.
Slide the air conditioner from the case by
F
gripping the base pan handle and pulling
forward while bracing the case. Do not pull or
lift on the foam discharge area.
PREPARE THE CASE
4
Attach the top rail gasket to the bottom of
A
the top rail.
Install the top mounting rail with 4 type A
B
screws from the inside of the case. Press
firmly to drive the screws into the gasket and
through the top mounting rail.
Top mounting rail
Installation Instructions
Do not
pull or
lift in this
damage
to the
unit may
result
FRONT
10
PREPARE THE CASE
4
Slide each side retainer onto the edge of
C
each according panel. The figure shows the
orientation of each accordion panel and side
retainer assembly relative to the case from a
top view of the unit.
SIDE RETAINER
WINDOW FILLER PANEL
SIDE RETAINER
WINDOW FILLER PANEL
Remove the backing from the accordion
D
seal (two short strips). Stick one sealing strip
respectively on the left side and right side of
the accordion panels, as shown.
Slide the left and right accordion panels into
E
the top and bottom mounting rails.
Top mounting rail
Top left
Bottom mounting rail
Attach the side retainers to the case using 6
F
type A screws.
Top right