Descargar Imprimir esta página

Glacier bay HD833X-0101 Guía De Uso Y Mantenimiento página 7

Ocultar thumbs Ver también para HD833X-0101:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Preparing for installation
CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply to the tub and
shower.
Verify that the hole sizes and positions of the
holes in the wall are correct:
The shower and tub spout outlet holes
should be 1-1/4 in. diameter.
For the cold water inlet (the right side)
and the hot water inlet (the left side),
cut or leave a 1-3/8 in. diameter hole
(recommended size is 1-3/4 in.). The
center to center distance between the
cold and hot water inlets is 8 in.
48 in.
Tub & Shower
30 in.
Shower Only
8 in. Min.
48 in.
Shower Only
30 in.
Tub & Shower
NOTE: Do not disassemble the cartridges during normal
installation. When reinstalling the cartridges, be sure to
insert with the cartridge slot (a & b) pointed outward as
shown in the diagram. This is necessary for proper
operation of the valve.
a
1-3/8 in. ~ 2 in.
1-3/8 in. ~ 2 in.
8 in.
b
2
Installing the supply
connections
NOTE: Be sure to position the valve body (D) correctly in
the wall, with the markings "UP" facing upward. Hot water
supply lines go into the "H" inlet; cold water supply lines
go into the "C" inlet.
Wrap thread sealant tape around the valve body
(D) threads in a clockwise direction, as shown.
Thread the waterline (1) to the valve body (D),
and tighten with a wrench.
Hot
7
Please contact 1-855-HD-GLACIER for further assistance.
D
Cold
HOMEDEPOT.COM/GLACIERBAY
1

Publicidad

loading

Este manual también es adecuado para:

Hd833x-000110029109411002910927