5.1 General notes
Careful maintenance:
ð
increased service life
ð
increased function
ð
reduced downtimes
ð
increased reliability
ð
reduced repair costs
Observe the safety regulations!
Maintenance works should only be carried out when the
engine is shut off.
The engine and machine should be cleaned thorougly
before carrying out maintenance work.
Park the machine on a flat surface and secure it against
rolling away and slipping.
Ensure that operating materials and replaced parts are
disposed of safely and in an environmentally - friendly
way.
Intervals
Works
Clean machine
1)
Check engine oil level
1)
Change engine oil
1)
Change engine oil filter
1)
Check, clean air filter
1)
Change air filter element
1)
Change fuel filter
Drain water
(Fuel tank)
Check cool air/combustion
1)
air intake
Check exciter oil level
Change exciter oil
Check hydraulic oil level
Change hydraulic oil
Change return filter
element
Change ventilation filter
Clean suction filter
Check rubber buffer
Retightened screw
connections
Check scrapers
Clean the water sprayer
Check, adjust the valve
1)
clearance
1)
Observe the engine manual
À ð first time
32
Maintenance schedule
daily
20 h
50 h
l
l
l
l
l
l
l
À
Before commencing work on any electrical equipment,
disconnect the battery and cover it with insulating
materials.
Do not confuse „PLUS" and „MINUS" poles on the
battery.
It is essential that short-circuits be prevented in cables
carrying current.
Burn-out lightbulbs in indicator lamps should be
replaced immediately.
When cleaning the machine with a high-pressure water
jet, do not spray the electrical components directly.
After washing the components, blow-dry them with
compressed air in order to prevent surface leakage
current and corrosion.
When carrying out welding work on the engine or
machine, earth the welding instrument as close as
possible to the welding point and disconnect the battery.
100 h
250 h
l
l
l
l
l
6. Maintenance
as
500 h
1000 h
required
l
l
l
À
l
l
À
l
À
l
l
l