PRESSURE TESTING HEATER GAS CONNECTIONS
1. Open equipment shutoff valve (see Figure
15, page 16).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
4. Check all joints from equipment shutoff
valve to control valve (see Figure 16 or
WARNING: Failure to posi-
tion the parts in accordance
with these diagrams or failure
to use only parts specifically
approved with this heater may
result in property damage or
personal injury.
CAUTION: After installation,
and periodically thereafter,
check to ensure that no flame
comes in contact with any log.
With the heater set to high, check
to see if flames contact any log. If
so, reposition logs according to
the log installation instructions
in this manual. Flames contact-
ing logs will create soot.
200133-01A
INSTALLATION
17, page 16). Apply a noncorrosive leak
detection fluid to all joints. Bubbles form-
ing show a leak.
5. Correct all leaks at once.
6. Light heater (see Lighting Instructions on
page 20). Check all other internal joints
for leaks.
7. Turn off heater (see To Turn Off Gas Ap-
pliance, page 21).
INSTALLING LOGS
It is very important to install the
logs exactly as instructed. Do
not modify logs. Use only logs
supplied with heater. Each log
is marked with a number. This
number will help you to identify
the logs when installing. After
installing logs, add decorative
cinders around the grate base,
do not place any decorative
cinders on logs or burner.
Rear Log
Bracket
Figure 18 - Heater Base Assembly
www.usaprocom.com
Middle Log Bracket
Front Log
Bracket
Grate
17