Descargar Imprimir esta página

DKN technology XC-190 Manual Del Usuario página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 25
Contents Checklist
Before beginning assembly, carefully read the following information and instructions:
Assembly requires two persons.
Unpack the box and prepare all the parts depicted above, checking to make sure all are present.
Place all parts in a cleared area and remove the packing materials.
Do not dispose of the packing materials until assembly is completed.
As you assemble the exerciser, make sure all parts are oriented as shown in the drawings.
hexalobular pan head bolt 3/8''*20mm(17)-4
Spring washer 3/8''*(18)-4
Cross recessed pan head
tapping screws
#8-18*16mm(19)-4
No.
10
12
13
14
15
16
17
18
19
20
( )
Name
Qty
1
1
Frame
1
2
Left extension stabilizer
1
3
Right extension stabilizer
1
4
Upright
5
1
Left Upper Body Leg
1
6
Right Upper Body Leg
7
1
left Upper Body Arm
8
1
Right Upper Body Arm
9
1
Rear Stabilizer Cover
1
Front Stabilizer Cover
11
2
Arm cover
1
Console
1
Rear console cover
1
Front console cover
1
Shield Cover
1
Shield Cover Cap
10
Button head screw
10
Split washer
11
self-tapping screw
4
hexagon screw
21
4
Lock nut

Publicidad

loading

Este manual también es adecuado para:

20539