Descargar Imprimir esta página

Bosch HCB5 651UC Serie Instrucciones De Instalación página 10

Ocultar thumbs Ver también para HCB5 651UC Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Procedure
CAUTION
9
Ensure that there are no electric wires, gas or water
pipes in the area where holes are to be made.
Preparing the installation
Mark a vertical center line on the wall from the ceiling
1.
to the lower edge of the extractor hood.
Align the drill template on the center line and the
2.
bottom edge of the extractor hood and glue on.
Mark positions for the screws and the contour of the
3.
attachment area.
Mark holes for the flue's angle brackets. The center of
4.
the angle bracket is marked with a hole. Place the
angle brackets in the center of the center line, align
them horizontally and mark the positions of the holes.
Fitting the wall retainer
Drill holes with Ø 5/16" (7.9 mm) for the angle
1.
bracket.
Press in the wall plugs flush with the wall.
2.
Screw screws (5x34 mm) into the wall plugs by hand
3.
in order to spread the plugs apart.
Unscrew screws.
4.
Screw on the angle bracket for the flue duct.
5.
Making the ceiling breakthrough
Using a spirit level, extend the center line of the drill
1.
template to the ceiling.
Mark the ceiling breakthrough (Ø 8 1/2" (216 mm)) at
2.
least 4 5/8" (117 mm) away from the wall.
Making the wall breakthrough
Using a spirit level, extend the center line of the drill
1.
template to the ceiling.
Depending on the curved section of the wall
2.
breakthrough (Ø 8 1/2" (216 mm)) mark at least 26 1/
2" (660 mm) above the bottom edge of the extractor
hood.
Mounting the extractor hood on the wall
WARNING
9
RISK OF INJURY
The appliance is heavy. To move the appliance, 2
people are required. Use only suitable tools and
equipment.
Initially remove the protective foil from the back of the
1.
appliance and, following installation, remove foil
completely.
Mark the upper holes on the wall.
2.
10
Note: Ensure that the holes are horizontal and aligned
centered on the center line.
Drill the upper holes. Maintain a distance of 1/4"
3.
(6 mm) between the wall and screw head.
Remove grease filter.
4.
Hang the extractor hood on the upper screws on the
5.
wall.
Mark the lower holes.
6.
Remove the extractor hood from the wall.
7.
Drill the lower holes.
8.
Hang the extractor hood on the upper screws on the
9.
wall.
Tighten the upper and lower screws by hand.
10.
Mounting the back-pressure flap
Using 4 screws (4x8 mm), attach the back-pressure flap
to the extractor hood.
Connecting the air extractor (only for
ducted operation)
Note: If an aluminum pipe is used, smooth the
connection area beforehand.
Attach exhaust air pipe and seal.
1.
Check whether the back-pressure flap works.
2.

Publicidad

loading

Este manual también es adecuado para:

Hcb56651ucHcb50651uc