Descargar Imprimir esta página

Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

NOTICE TO INSTALLER: Instructions must remain with installation.
Your Peace of Mind is Our Top Priority
Product information presented
here reflects conditions at time
of publication. Consult factory
regarding discrepancies or
inconsistencies.
Register your
Zoeller Pump Company
Product on our website:
http://reg.zoellerpumps.com/
600 SERIES SUBMERSIBLE NON-CLOG UNITS
Congratulations on the purchase of the Zoeller Pump Company 600
Series submersible pump. Since 1939 the name Zoeller has represented the
standard for submersible dewatering and sewage pumps. The same high
quality workmanship and easy maintenance design has been incorporated
into this line of heavy-duty solids-handling submersible sewage pumps. This
Zoeller Pump Company pump will provide years of trouble-free service when
installed according to the manufacturers' recommendations.
This manual incorporates the installation, operation, maintenance, and
service instructions into one document to aid in the ownership of a Zoeller
Table of Contents
Safety Instructions ....................................................................... 1
Limited Warranty .......................................................................... 2
Performance Data ......................................................................... 2
Preinstallation Information .......................................................... 3
Electrical Data ............................................................................... 3
Typical Dewatering Installation ................................................... 4
Typical Sewage Installation ........................................................ 4
Pump Wiring Instructions .........................................................5-6
Operation ....................................................................................6-7
Maintenance .................................................................................. 7
Service Checklist .......................................................................... 8
Owner's Information
Model Number: _______________ Date Code: _______________
Serial Number: Pump 1_____________ Pump 2_____________
 Simplex  Panel P/N ______________________________
 Duplex  Rail System P/N ________________________
Job Name: ____________________________________________
Distributor: ____________________________________________
Sales Order Number: ____________________________________
Contractor: ____________________________________________
Date of Installation: _____________________________________
System Readings During Operation: Voltage _____ Amps _____
®
MAIL TO: P.O. BOX 16347 • Louisville, KY 40256-0347
SHIP TO: 3649 Cane Run Road • Louisville, KY 40211-1961
TEL: (502) 778-2731 • 1 (800) 928-PUMP • FAX: (502) 774-3624
OWNER'S MANUAL
© Copyright 2017 Zoeller
Pump Company submersible non-clog wastewater product. Please read
and review this manual before installing the product. Follow the steps and
procedures listed on FM0990 for a proper start-up. Many items contained
within, when followed correctly, will not only ensure a long and problem-free
life for the pump, but also save time and money during installation. Reference
FM1799 for repair manual on 600 Series pumps. Should further assistance be
necessary please call our Product Support Department at 1-800-928-PUMP
(7867).
Safety Instructions
TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MA-
JOR PROPERTY DAMAGE, READ AND FOLLOW ALL SAFETY
INSTRUCTIONS IN THIS MANUAL AND ON THE PUMP.
THIS MANUAL IS INTENDED TO ASSIST IN THE INSTALLATION
AND OPERATION OF THIS UNIT AND MUST BE KEPT WITH
THE PUMP.
This is a SAFETY ALERT SYMBOL.
When you see this symbol on the pump or in the
manual, look for one of the following signal words
and be alert to the potential for personal injury or
property damage.
Warns of hazards that WILL cause serious personal
injury, death or major property damage.
Warns of hazards that CAN cause serious personal
injury, death or major property damage.
Warns of hazards that CAN cause personal injury
CAUTION
or property damage.
INDICATES SPECIAL INSTRUCTIONS WHICH ARE
VERY IMPORTANT AND MUST BE FOLLOWED.
THOROUGHLY REVIEW ALL INSTRUCTIONS AND WARNINGS
PRIOR TO PERFORMING ANY WORK ON THIS PUMP.
MAINTAIN ALL SAFETY DECALS.
REFER TO WARRANTY ON PAGE 2.
Co. All rights reserved.
®
Supersedes
Visit our web site:
www.zoellerpumps.com
FM1798
0717
0417

Publicidad

loading

Resumen de contenidos para Zoeller E661

  • Página 1 Product Support Department at 1-800-928-PUMP This manual incorporates the installation, operation, maintenance, and (7867). service instructions into one document to aid in the ownership of a Zoeller Table of Contents Safety Instructions TO AVOID SERIOUS OR FATAL PERSONAL INJURY OR MA- Safety Instructions ...............
  • Página 2 Each Zoeller Pump Company 600 Series Pump installation is required to have a completed Zoeller Pump Company Start-up Report (FM0990). The report is to be completed by an approved Start-up Technician in the presence of the installing contractor. A copy of this report will be on file at the Zoeller Pump Company offices in Louisville, KY.
  • Página 3 G651 1750 29.0 BA651 1750 23.0 J661 7-1/2 1750 25.3 17.9 18.3 83.0 F661 7-1/2 1750 22.0 15.0 15.7 72.0 G661 7-1/2 1750 11.0 36.0 BA661 7-1/2 1750 29.0 *Consult Factory. © Copyright 2017 Zoeller Co. All rights reserved. ®...
  • Página 4 (14) Install ring and cable for lifting pump from pit. (15) Basin must be clean and free of debris after installation. (16) Cords must be properly sealed to prevent moisture and gases from entering the control panel. ZEPA0071 © Copyright 2017 Zoeller Co. All rights reserved. ®...
  • Página 5 (3) Oil in the motor housing and lower seal cavity must be checked when pump is serviced. If oil from the motor housing contains water or other contamina- tions, both seals should be replaced during maintenance. Always replace with new factory recommended oil and service parts. All warranty repairs must be made by Zoeller Authorized Service Stations. CONTROL PANELS These pumps are nonautomatic.
  • Página 6 All single phase models require start capacitor, run capacitor and relay in the circuit to start and operate properly. These components can be purchased separately or prewired in Zoeller Pump Company control panel. For components purchased separately used the diagram for installation and hookup.
  • Página 7 • Dark oil, burnt odor - Pump motor has overheated. Check the motor winding to servicing. resistance to ground. Ohm readings of 1 megohm or higher is required. If lower readings are present, return the unit to an Zoeller Authorized Service and Warranty GENERAL SYSTEM INSPECTION Center for service.
  • Página 8 If the above check list does not uncover the problem, consult the factory - Do not attempt to service or otherwise disassemble pump. These are the original installation instructions. © Copyright 2017 Zoeller Co. All rights reserved. ®...
  • Página 9 Enhorabuena por la compra de una bomba sumergible trituradora Zoeller propietario de un producto sumergible de aguas residuales Zoeller Pump Pump Company. Desde 1939, el nombre Zoeller ha representado el estándar Company. Lea y revise este manual antes de instalar el producto. Siga para bombas sumergibles de achique y aguas negras.
  • Página 10 Cada instalación de bomba Zoeller Pump Company Serie 600 debe contar con un informe de puesta en marcha de Zoeller Pump Company (FM0990). El informe debe ser realizado por un técnico de puestas en marcha aprobado en presencia del contratista de instalación. En las oficinas de Zoeller Pump Company en Louisville, KY se guardará...
  • Página 11 1750 23.0 J661 7-1/2 1750 25.3 17.9 18.3 83.0 F661 7-1/2 1750 22.0 15.0 15.7 72.0 G661 7-1/2 1750 11.0 36.0 BA661 7-1/2 1750 29.0 © Copyright 2017 Zoeller Co. Todos los derechos reservados. * Consulte con la fábrica. ®...
  • Página 12 (15) El contenedor deberá estar limpio y libre de desechos después de la instalación (16) Los cables deben estar sellados adecuadamente para evitar que la humedad y los gases entren en el panel de control. ZEPA0071 © Copyright 2017 Zoeller Co. Todos los derechos reservados. ®...
  • Página 13 Se debe comprobar el aceite en la carcasa del motor y en la cavidad sellada inferior cuando se repare la bomba. Si el aceite de la carcasa del motor contiene agua u otro contaminante, ambos sellos deben reemplazarse durante el mantenimiento. Siempre reemplace con nuevas piezas de servicio y aceite recomendados de fábrica. Todas las reparaciones en garantía deben ser realizadas por Centros de servicio autorizados Zoeller. PANELES DE CONTROL Estas bombas son no automáticas.
  • Página 14 Todos los modelos monofásicos requieren de un circuito con condensador de arranque, condensador de marcha y regulador para poder arrancar y funcionar debidamente. Estos componentes se pueden comprar por separado o precablearse en el panel de control de Zoeller Pump Company. Para componentes comprados por separado use el diagrama de instalación y conexión.
  • Página 15 1 megaohmio o más. Si se presentan lecturas más INSPECCIÓN GENERAL DEL SISTEMA bajas, lleve la unidad a un Centro de servicio autorizado Zoeller para su Antes de poner en marcha el sistema, un técnico calificado deberá hacer un reparación.
  • Página 16 Si esta lista no le ayuda a identificar el problema, consulte al fabricante - No intente reparar ni desarmar la bomba. Esta es una traducción de las instrucciones de instalación originales. © Copyright 2017 Zoeller Co. Todos los derechos reservados.
  • Página 17 à entretenir. La pompe Zoeller Pump longue vie sans souci à la pompe mais aussi réaliser des économies de temps et d’argent au moment de l’installation.
  • Página 18 Toute installation d’une pompe de la série 600 de Zoeller doit être accompagnée d’un rapport de mise en marche Zoeller Pump Company (FM0990) complété. Ce rapport doit être rempli par un technicien de mise en marche autorisé en présence du contracteur d’installation. Une copie de ce rapport sera conservée aux bureaux de Zoeller Pump Company à...
  • Página 19 1 750 23,0 J661 7-1/2 1 750 25,3 17,9 18,3 83,0 F661 7-1/2 1 750 22,0 15,0 15,7 72,0 G661 7-1/2 1 750 11,0 36,0 BA661 7-1/2 1 750 29,0 *Consulter l'usine © Copyright 2017 Zoeller Co. Tous droits réservés. ®...
  • Página 20 (15) La cuve doit être propre et exempte de tout débris après l'installation. (16) Les cordons doivent être scellés pour empêcher l’humidité et les gaz de pénétrer dans le panneau de commande. ZEPA0071 © Copyright 2017 Zoeller Co. Tous droits réservés. ®...
  • Página 21 être remplacés lors de l’entretien. Toujours les remplacer avec l’huile et les pièces de rechange recommandés par l’usine. Toutes les réparations sous garantie doivent être effectuées par un centre d’entretien autorisé de Zoeller.
  • Página 22 Tous les modèles monophasés nécessitent un condensateur de démarrage, un condensateur de fonctionnement et un relai dans le circuit afin de démarrer et de fonctionner correctement. Ces composantes peuvent être achetées séparément ou être incluses dans le panneau de commande Zoeller Pump Company. Suivre le schéma de câblage pour l'installation et le branchement des composantes achetées séparément.
  • Página 23 AVIS à flotteur ou la commande sont défectueux. un centre d’entretien autorisé de Zoeller Pump Company ou un Centre de garantie. • Inspecter le panneau pour détecter toute présence d’humidité dans le boîtier, de branchements desserrés et l’état général du composant. Vérifier l’emplacement INSTRUCTIONS DE SÉCURITÉ...
  • Página 24 Si les vérifications ci-dessus ne résolvent le problème, consulter l’usine. Ne pas essayer de réparer ou de démonter la pompe. Il s'agit ici d'une traduction des instructions d'origine. © Copyright 2017 Zoeller Co. Tous droits réservés. ®...