6.
Pull the cotter pin out of the front deck lift rod securing it
to the deck. See Figure 7-6. Slide the deck lift rod out of the
front hanger bracket.
7.
Locate the LH and RH deck release pins on each side of the
deck. Pull the release pins outward and release the deck
from the LH and RH deck lift arms. See Figure 7-7.
Deck
Lift
Arm
Deck
Release
Pin
8.
Place the deck lift handle into the highest mowing position
and slide the deck out from beneath the tractor.
30
S
7— S
ection
ervice
Front Deck Lift Rod
Cotter Pin
Figure 7-6
Figure 7-7
Deck Installation
Install the deck on the tractor as follows:
1.
Place the deck lift handle in the highest mowing position See
Figure 7-3.
2.
Slide the deck under the tractor on the right side of the tractor
lining up the deck hanger brackets and the deck lift arms.
3.
Once the deck is under the tractor, move the deck lift
handle to the lowest mowing position.
NOTE: To line the brackets up properly, it may be necessary to
place a small block of wood under each side of the deck.
4.
Pull the deck release pins outward and maneuver the deck
as necessary to align the holes in the deck lift arms with the
pins. Refer to Figure 7-7.
5.
When aligned, push each pin fully inward through the lift
arms to secure the arms in the rear hanger bracket slots.
6.
Reinstall the front deck lift rod and secure in place with the
cotter pin. Refer to Figure 7-6.
7.
Make certain the 'V' belt is in the spindle pulleys on the
deck; then route the belt rearward beneath the tractor
frame, above the transmission tube(s), to the PTO pulley on
the bottom of the engine.
8.
Using the deck lift handle, raise the deck to the position
that provides the most horizontal run of the belt between
the deck idler pulleys and the PTO pulley on the bottom of
the engine.
9.
Make certain the belt is in the spindle pulleys of the deck,
and that the backside of the belt is against both the fixed
and movable idler pulleys.
10.
Sitting behind the tractor, facing forward, make certain the
belt is not twisted; then reach beneath the tractor to grasp
the belt and pull it toward the PTO pulley.
WARNING!
Use caution to avoid pinching your
fingers when rolling the belt onto the PTO pulley.
11.
Pull the right side of the belt rearward and place the narrow
V side of the belt into the PTO pulley. See Figure 7-5.
12.
While holding the belt and pulley together, rotate the pulley
to the left (See Figure 7-5). Continue holding and rotating the
pulley and belt until the belt is fully rolled into the PTO pulley.
NOTE: Before using the tractor double-check the belt
routing to make sure that the belt has been routed properly.