Descargar Imprimir esta página

John Bean B400 Manual Do Operador página 120

Publicidad

120
ii-1
ii-2
Installation
ii Transportation, unpacking and contents
Transportation
The wheel balancer is supplied on a pallet.
• Use a pallet truck (Figure ii-1) to bring the wheel
balancer to its working area.
Unpacking
WARNING: pREVENT THE STRApS FROM
SPRINGING LOOSE AFTER BEING CUT.
Cut the straps.
Open the top of the box.
Remove staples at the bottom of the box. Lift the
box up and over the unit.
Carefully unwrap the balancer and spare parts
supplied.
Check the contents of the shipment.
Contents
The shipment contains:
-
a wheel balancer.
-
an Operator's Manual with Declaration of Conformity
(CE).
-
the accessories mentioned in Section 3.1 of the
Operator's Manual.
-
3 storage hooks and flanges.
-
a mains power cable.
-
a wheel guard assembly (if present).
Tools required
-
screwdriver / bar (diameter 4.5-5 mm)
-
keys: 13, 17 mm
-
Allen wrench: 5 mm
Positioning
Remove the bolts that secure the wheel balancer
on the pallet.
CAUTION: DO NOT LIFT OR MOVE THE WHEEL
BALANCER BY THE MAIN SHAFT OR MEASURING
UNIT.
Refer to Figure ii-2. Move the wheel balancer from
the pallet to its working location.
Note: Use the storage hooks (mount as
instructed in section iii) and/or the wheel guard shaft
(if present) to handle the wheel balancer.

Publicidad

loading