Descargar Imprimir esta página

Bradley SN2004 Manual De Instalación página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

SN2004, SN2024 - Infrared
Rough-In Dimensions for Supplies and Drain
Notes
Maximum flow rate required to washfountain is 1 .5 GPM . Size
supply lines accordingly .
Supplies from Below: Stub up 2-1/2" (64) .
Supplies from Above: Supplies must be located on centers of
dimensions shown to pass through washfountain shroud and
sprayhead .
Drain through floor: Stub up 3" (76) .
Supplies from Below or Through Wall
Type A
Off-line vent
(P-Trap supplied by
Installer .)
Top View
2-3/4"
(70)
5"
(127)
C
C L
4-1/2"
(114)
H
5"
(127)
When running supplies and drain through wall, use same horizontal measurements as shown in Top View. Postion
openings above the finished floor, at the following dimensions (to center):
Drain: Standard Height: 19-1/4" (305)
Juvenile Height: 15-1/4" (387)
4
Type H
Centrally rising vent
(P-Trap furnished
with unit .)
2-3/4"
(70)
C
4-1/2"
(114)
C L
4-1/2"
(114)
H
5"
(127)
9-1/4"
(235)
Supplies: Standard Height: 12" (305)
8/21/2017
Key
1/2" Supply: Nominal Copper Tube
1/2" Supply Through Wall (Optional): Nominal Copper Tube
1-1/2" NPT Drain
1-1/2" NPT Vent
Supplies from Above
Type B
Centrally rising vent
(P-Trap furnished
with unit .)
Top View
2-3/4"
(70)
27/32"
(21)
C
H
27/32"
(21)
8-1/16"
(205)
9-1/4"
(235)
Juvenile Height: 8" (203)
Bradley • 215-1071 Rev. M; ECN 17-00-002
Installation
(mm)
Type O
Off-line vent
(P-Trap supplied by
Installer .)
2-3/4"
(70)
27/32"
C
C L
27/32"
H
8-1/16"
(205)
(21)
C L
(21)

Publicidad

loading

Este manual también es adecuado para:

Sn2024