Descargar Imprimir esta página

Bradley SN2004 Manual De Instalación página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
1
Install Unit
Rough-in of plumbing lines and wall braces must be completed before
unit can be properly installed.
Remove Access panel and
A
with the help of another
person, place unit in position
against wall .
Water Supply Gang
B
Ensure unit is level, shimming floor unit if
necessary . Mark the wall anchor locations .
2
Connect Water Supply to Valve Assembly
Connect stops to hot and cold water supply .
A
Connect one end of each supply hose to a stop
and the other end to the hot and cold inlets of
the Navigator TMV .
Do not turn on water until
Step 4 is completed!
Bradley • 215-1071 Rev. M; ECN 17-00-002
Valve Assembly
OPTIONAL TEMPERED LINE CONNECTION: Connect
B
stop to supply . Connect one end of the supply hose to the
stop and the other end to the tempered line adapter in the
gang valve assembly as shown .
Install suitable wall anchors (supplied
C
by installer) for 3/8" bolts at the marked
locations . Secure unit to wall .
Red Tube
(to Aerator)
Green Tube
(to Aerator)
Black Tube
(to Aerator)
Yellow Tube
(to Aerator)
Navigator TMV
(S01-526)
Cold Supply Inlet
8/21/2017
SN2004, SN2024 - Infrared
Water Supply
Gang Valve
Assembly
OPTIONAL
Tempered Line
Adapter Assembly
(S39-804)
Braided
Hose
Stop Valve
Hot Supply Inlet
5

Publicidad

loading

Este manual también es adecuado para:

Sn2024