4. Secure the Vanity
Hanger
With assistance, lift and position the vanity onto the hanger.
Verify that the vanity is level and plumb against the wall.
The vanity must be secured to all wall studs or the 2x8 support in the top rail of the vanity.
From inside the vanity, drill 1/8" (3 mm) holes into the top rail of the vanity aligned with the wall studs.
Using a drill with the T30 Torx drill bit (provided), secure the vanity to the wall with the T30 Torx head screws
(provided).
Kohler Co.
Top Rail
7
Pilot Hole
T30 Torx Head Screw
T30 Torx Drill Bit
Leveler
1533267-2-A