VENTILATION HOOD OR ADJACENT LOCAL
The product can distribute heated air by natural convection or forced convection by means of a centrifugal fan (see the OPTIONAL kit
ventilation separate instructions):
DuRINg INsTALLATION, IT Is NECEssARy TO EsTAbLIsH THE TyPE Of VENTILATION OR CONVECTION TO bE ADOPTED
A) NATuRAL CONVECTION:
To ease the natural circulation of air (upward movement due to the heating of the same) the semi-blanks must be removed from the
underlying outer shell (see
By choosing this convection system, it is recommended not to install the OPTIONAL kit ventilation
b ) fORCED CONVECTION:
By installing the OPTIONAL kit ventilation, it is possible to distribute hot air to adjacent rooms by means of ducts with a length up to 4
meters. In this case, do not remove the underlying semi-blanks (see
The outer upper cover is equipped with 4 outputs with a diameter of 150 mm for the connection of pipes resistant to heat.
a)
Perform the drilling on the walls or on the existing hood to allow the passage and the application of the (fire-resistant) hoses with a 15
cm diameter equipped with related openings.
b)
Fasten the pipes by means of clamps to the related collars and openings, after having removed the semi-blanks caps.
c)
Each pipe must not exceed 2 m of length for natural ventilation and 4 m for forced ventilation, and has to be insulated with insulating
materials to avoid noise and dispersion of heat.
d)
The openings have to be positioned at a height not lower than 2 m from the floor to avoid that hot air at output meets people. Please
respect the distance of the convection openings according to the local construction norms;
e)
The lengths of the canalization pipes must have the same length to avoid the distribution of differing quantities of air from each
output (see
Picture
13).
28
28
Picture 12 -
15).
Picture 12 -
15).
ENGLISH