Descargar Imprimir esta página
Ocultar thumbs Ver también para Classic Serie:

Publicidad

Enlaces rápidos

WT1-100C
TUB & SHOWER
12-20-02 ECN 6453B
27923-0100

Publicidad

loading

Resumen de contenidos para Price Pfister Classic Serie

  • Página 1 WT1-100C TUB & SHOWER 12-20-02 ECN 6453B 27923-0100...
  • Página 2 1⁄2 inch iron pipe plug (2) 1⁄2 inch Pipe nipple, up to 6" long (length may very upon installation). Gracias por la compra de esta válvula para la ducha de Price Pfister. Todos los RECOMMENDED COMPONENT LOCATIONS productos Price Pfister se diseñan y prueban en fábrica cuidadosamente para A-Shower head location.
  • Página 3 1-1/4"-1-3/4" VALVE INSTALLATION SUPPLY CONNECTION LAYOUT CAUTION: Be sure to position the valve body (A) correctly in wall,”UP” CAUTION: Reducing outlet supply pipe diameter is not recommended! marking up. 1. Wrap 3 to 5 layers of pipe tape around pipe threads in a clockwise direction. 1.
  • Página 4 FLUSHING and PRESSURE TESTING VÉRIFICATION DE LA PRESSION ET DE LA VIDANGE (Air testing is not (l’épreuve recommended) à l’air n’est pas recommandée) FLUSHING VIDANGE Pour les combinaisons baignoire et douche For Tub and Shower Combinations 1. Turn on Hot and Cold water supply lines. Pressure must be approximately equal 1.
  • Página 5 HANDLE & TRIM ATTACHMENT SHOWER ARM INSTALLATION & FINAL FLUSHING (after wall treatment is complete) Note: 1. Insert the long end of the shower arm (A) through the flange (B) then apply A Shower and/or Tub outlets must be 1-1/4" Diameter. PTFE plumbers tape or thread sealant to both ends of Shower Arm.
  • Página 6 TUB SPOUT INSTALLATION 1. Put PTFE plumbers tape or thread sealant on both threaded ends of pipe nipple* (A). 2. Screw pipe nipple into the elbow inside the wall and tighten with a pipe wrench. 3. Screw tub spout (B) onto pipe nipple and tighten until spout is properly positioned and flush to the finished wall surface.
  • Página 7 960-170A 973-030A 973-100A...

Este manual también es adecuado para:

Classic wt1-100c