Balcony Solar Power System Installation Steps Overview
• Step A: Find a suitable location to install the balcony solar power system.
• Step B: Install the first solar panel.
• Step C: Install the microinverter.
• Step D: Install the second solar panel.
• Step E: Connect the solar panel to the microinverter via the solar panel's extension cable, then wait for 90 seconds.
NOTE: This step must be done with sufficient sunlight for the solar panel to provide power to the microinverter.
• Step F: Scan the QR code and download the Anker app. Follow the in-app instructions to complete the microinverter
configuration and Schuko cable connection.
NOTE: This step must be done while your home's electrical grid has power.
• Step G: After 20 minutes, you will get the balcony solar power system's data on your Anker app.
NOTE: According to the government's regulations and to ensure safety, the microinverter can only start working after connecting
to a powered grid for 5 minutes. To improve the accuracy of the data, the system will verify and validate it for 15 minutes before
showing it on the app.
Components Overview
Solar Panel
Microinverter
1
Note: The product's appearance varies by supplier and batch.
1. Mounting
3. Wi-Fi Module
2. AC Connector
4. QC4 Female Socket
61 EN
2
4
5
3
5. QC4 Male Pin
Pre-Installation
If you wish to verify and commission your solar system immediately, complete the installation when the weather is sunny.
During installation or removal, we recommend that at least two people work together.
Selecting a Location
The solar panel can be installed on the balcony or the ground. Different locations require different installation methods and
accessories. Select an appropriate location before installing the solar panels.
NOTE: Please refer to the Safety Instructions and Datasheets to get the product size and select the appropriate location.
Measuring the Distance
Determine the position of the microinverter and solar panel with the Schuko connection cable and solar panel's extension cable.
·
Additional extension cables may be required.
T
EN 62