Descargar Imprimir esta página

Anker Solix Serie Manual De Instalación página 36

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 37
5. Turn on Bluetooth on your phone.
6. Download the app, and follow the in-app instructions to finish the microinverter configuration and Schuko cable connection,
Then you can connect the microinverter to your home grid via the Schuko cable.
Auto Mode:
① Scan the QR code or search "Anker" on the App Store, Google Play, or other official app stores to download the app.
② Sign up/log in to your Anker account.
③ Tap Add Devices/+ > MI80 Microinverter (BLE).
④ Select your home's Wi-Fi, enter the password, then click the Next button. You will be directed to the Scanning page. Wait a moment.
⑤ If you are redirected to the No Devices Found page, press the Retry Now button, then repeat step 4.
⑥ If you are redirected to the Added Successfully page, the configuration is complete. You can also revise the device name on
this page.
Manual Mode:
① Scan the QR code or search "Anker" on the App Store, Google Play, or other official app stores to download the app.
② Sign up/log in to your Anker account.
③ Tap Add Devices/+ > Balcony Solar Power System > MI80 Microinverter (BLE).
④ Follow the in-app instructions and tap The device has been reset.
⑤ Select your home's Wi-Fi, enter the password, then click the Next button. You will be directed to the Scanning page. Wait a moment.
⑥ If you are redirected to the No Devices Found page, press the Retry Now button, then repeat step 4.
⑦ If you are redirected to the Added Successfully page, the configuration is complete. You can also revise the device name on
this page.
65 EN
7. For your privacy and security, the microinverter will automatically turn off Bluetooth after commissioning is finished. You can
turn on the microinverter's Bluetooth again by disconnecting and reconnecting the DC wires. Follow the above steps to complete
commissioning within 15 minutes.
LED Guide
When sufficient DC voltage from the module is applied, the microinverter will be powered, and the LED will start flashing.
LED Indicator
Description
DC power is first applied to the microinverter,
Ten Short Green Flashes
the startup is successful.
Flashing Green Every 5 Seconds
Producing power.
The microinverter is in protection status or
Flashing Red Every 5 Seconds
disconnected from the grid.
Ground Fault Detector Interrupter (GFDI)
Steady Red
error in the PV system is detected.
How To
Follow the instructions to start the
configuration.
The system is working.
Check if the AC input of the micro
inverter is normal. If so, make sure that
the microinverter is connected to the
network and contact Anker Support.
Check if the DC input of the microinverter
is mistakenly connected to the ground or
contact Anker Support.
EN 66

Publicidad

loading