GUTMANN Rayo Instrucciones De Montaje página 17

Ocultar thumbs Ver también para Rayo:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
12. Lift up the extractor hood and push it
into the upper tower, so that the pre-
pared oblong holes align with the fas-
tening holes in the module.
13. Fasten the cooker hood to the upper
tower (using the enclosed 15 M5
screws).
14. By removing the adhesive tape,
loosen the lower tower and pull down
until it is positioned on the hood.
15. Carry out a functional test!
Single-piece tower unit
1. Remove plastic blind plugs on module
(4 pcs.)
2. Unscrew the sheet metal screws on
the module (4 pcs.)
3. Push the metal clips into the tube and
engage in the groove, with a hammer, if
necessary (4 pcs.)
en
17

Publicidad

Tabla de contenido
loading

Tabla de contenido