INSTALLATION - VENTED TO THE OUTSIDE
STEP 1: MOUNT TEMPLATE
Align the template with the marks on the ceiling
and tape in place.
– Be sure the template is oriented correctly with
the front of the hood.
Use a plumb bob to be sure the mounting holes
will provide parallel alignment with the countertop
below.
Determine wire access hole location.
Center punch all screw and determined wire hole
locations.
Drill pilot holes in the 4 screw locations. Use a
Cut one 1/2" Dia.
Wire Access Hole
as Needed
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
NOTE: Only for recirculating version, air deflector
not included.
INSTALL AIR DEFLECTOR INTO CEILING
SUPPORT
Lay ceiling support on a firm surface.
Position the air deflector
onto the ceiling support,
duct opening up and one
of the open sides to what
will be the front of the
hood assembly. The tabs
on the deflector will be to
the outside of the ceiling
support.
deflector to the ceiling support.
16
Installation Instructions
Drill 3/16" Pilot Holes
Approx. 1-1/2" Deep
4 Places
10-5/16" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
Wire Access Hole
as Needed
36" HOOD
TEMPLATE
8-1/4" To
Centerline of
Pilot Holes
Cut one 1/2" Dia.
10-5/16" To
Wire Access Hole
as Needed
Centerline of
Pilot Holes
FRONT OF HOOD
STEP 2: INSTALL CEILING SUPPORT
Using 4 wood screws provided, attach the ceiling
support to the ceiling over duct opening hole
using pilot holes drilled in step 1.
STEP 3: INSTALL LOWER
HORIZONTAL SUPPORTS TO HOOD
ASSEMBLY
• Install the lower horizontal support to 4 lower vertical
31-14772
Printed in Mexico 12-08 JR
B
C
Front
Screws
A
A. Lower horizontal support
C. 4 - Lower vertical supports
49-7000198 Rev. 0