6. Test Run the Whirlpool
Check all electrical connections, and make sure the electrical power to the whirlpool and in-line
heater (if equipped) is on.
Make sure all union connections to the pump and heater are securely hand tightened.
Verify that the pump banding straps have been cut (if applicable), and that the pump is resting
directly on the subfloor or whirlpool base.
Fill the whirlpool to a level at least 2" (5.1 cm) above the top of the highest jet.
Operate the whirlpool for 5 minutes, and check all whirlpool piping connections for leaks.
For additional information on whirlpool operation, refer to "Confirm Proper Operation".
7. Complete the Finished Wall
If you have not already done so, carefully remove the protective tape from the whirlpool rim.
Cover the framing with water-resistant wall material. Seal the joints between the whirlpool rim edge
and the water-resistant wall material with silicone sealant.
Tape and mud the water-resistant wall material. Install the finished wall to the water-resistant wall
material. Seal the joints between the whirlpool rim and the finished wall material with silicone
sealant.
Install the faucet trim according to the instructions packed with the trim.
1015054-2-B
Whirlpool
Tile should be within 1/4"
(6 mm) of deck surface.
10
Concrete Wall
or Studs
Water-Resistant
Wall Material
Finished Wall
Apply silicone
sealant to the joint
between the
whirlpool and the
finished wall.