Descargar Imprimir esta página

Kohler K-T125 Instrucciones De Montaje página 7

Ocultar thumbs Ver también para K-T125:

Publicidad

Idiomas disponibles

Idiomas disponibles

Ceramic Cap
Oval Handle
Setscrew
Flathead Screw
Screw
Stem
Extension
Valve Stem
5. Install Artist Edition Handles
All Installations
Apply a bead of plumbers putty or other sealant around the
bottom of the escutcheon according to the putty manufacturer's
instructions.
Thread the escutcheon onto the valve body.
Place the ceramic bell over the escutcheon.
Tighten the bonnet nut with a wide blade screwdriver.
Lever Handle
Position a stem extension on each valve stem.
Align and press a handle onto the stem extension.
Secure with a screw.
Six Prong Handle
Install a stem extension on each valve stem with a screw.
Press a six-prong handle onto each stem extension.
Align the text on the ceramic buttons as desired.
Secure with a setscrew.
Oval Handle
Install a stem extension on each valve stem with a screw.
Kohler Co.
Setscrew
Six-Prong Handle
Screw
Lever
Handle
Screw
Stem
Extension
Stem
Extension
Bonnet Nut
O-Ring
Ceramic Bell
Stem
Escutcheon
7
114128-2-AB

Publicidad

loading

Este manual también es adecuado para:

K-t135