Elbow
Elbow
3. Complete the Valve Installation
NOTE: This section applies to all valve installation styles.
Plumb using 1/2" N.P.T. copper tubing, elbows, and adapters.
Use thread sealant on all threaded connections.
Secure the bath and shower piping to the support framing and
install temporary nipples.
Make sure the valves are closed.
Turn on the main water supply.
Turn on the water to flush debris from valve and check for leaks.
Turn off water.
Complete the finished wall.
Kohler Co.
Temporary
Nipple
1/2" NPT
Copper Tubing
Adapters
1/2" NPT
Copper Tubing
Temporary
Nipple
5
1031377-2-B