Descargar Imprimir esta página

Mitsubishi Electric TRANE TURYP0723AN40AN Manual De Instalación página 22

Publicidad

Idiomas disponibles

Idiomas disponibles

9-4-2. Example of pipe connection between an outdoor unit and BC controller, and between a BC
controller and indoor unit (R2 system)
P072 to P168
E072 to E240
Unit 1
A
A
a
b
a
P192 to P336
E192 to E432
Unit 1
Unit 2
A1
A2
A2
A1
A
a
*1
j
Ⓑ Ⓒ
l
i
k
* Contact your dealer for pipe connection examples when connecting TCMBG****SJ11N4, TCMBM****JA11N4, TCMBM****KA11N4, or TCMBS****KB11N4.
WT09115X03
b
B
B
c
c
*1
A
C
C
C
b
a
b
B
B
c
c
*1
d
d
e
e
D D
D
E
E
E
F
F
F
d
f
d
f
GB-20
Outdoor unit
BC controller (Main)
BC controller (Sub)
Indoor unit (Total capacity of downstream indoor
units: 05 to 30)
Indoor unit (Total capacity of downstream indoor
units: 72 to 96)
Joint Pipe Kit
2-Branch Joint Pipe
Outdoor unit twinning kit
High-pressure pipe (A, A
Low-pressure pipe (A, A
1
High-pressure pipe (C, D, E, F, G, H, I)
Low-pressure pipe (C, D, E, F, G, H, I)
Liquid pipe (C, D, E, F, G, H, I)
Liquid pipe (a, b, c, d, e, f, g, h)
Gas pipe (a, b, c, d, e, f, g, h)
G
I
I
G
I
G
H
H
H
g
g
, A
)
1
2
, A
)
2
h
h

Publicidad

loading