Care and cleaning of the reverse osmosissystem.
Prefilter, Postfilter and Reverse Osmosis Membrane
Cartridge Replacement
Procedure
When
the
amber
filter
light
in the
faucet
base
flashes,
it is time
to replace
tim
prefilter
and
postfilteL
This
will occur
every
6 months.
Be sure
to wash
your
hands
before
handling
inner
parts
of the
system.
1. Turn OFF file icemaker (if attached to
file sysmm).
2.
3.
Turn offwater supply m file sysmm.
OFF
._........-5:)
,,-"-:: "};i:K'-/"
ON
Turn ON faucet m drMn rank (may take seve_M
minutes).
Turn OFF faucet when rank is empty.
4. Remove tile prefilmi; postfilter and Reveise
Osmosis camidge
by romdng m tile left about
1/3 turn.
6.
Z
8.
9.
Remove foil on top of new replacement
cam_idges. Install new cam_idges into the
manifold by turning to the right about 1/3 turn
until the alignment marks line up and the
cartridges stop. DO
NOT0VERnSHTEN.
The
cam-idges will rise up as they are turned.
NOTE:The prefilter and postfilter are identical.
You m W install either filmr in the prefilter or
postfilmr position. The reverse osmosis cartridge
is installed in tile cenmr position.
Turn ON wamr supply to fill file sysmm
(may take up to four hours). Check for leaks.
Remove
die battery
tray and replace
die
baEery, positive
"+" side down, to reset timer
and monitor
flmcfion
in faucet
base (see Battery
Installation for proper
procedure).
NOTE:Allowat least 90 seconds to elapse before
installing new battery. This will ensure a dill
elecnonic reset and proper operation for the
next 6 months.
If only die prefilmr and postfilmr are replaced,
mrn the faucet ON and empty the flled storage
rank. If the membrane
camidge is replaced, fill
and empty the storage rank a mt_fl of four times.
(This will remove the food grade preset, retires
contained in new membranes. This preservative
will gNe product wamr an unpleasant
taste
and odoL)
10. Once die storage
rank is full, mrn on die
icemakeL
NOTE: System should be sanitized when replacing
the prefilmr and postfilter cam_idge or the Reverse
Osmosis cartridge. Follow tlle
Sanitizing the
Reverse
Osmosis System procedure
on page 19.
To remove
5. Follow Sanitizing the Reverse Osmosis System
procedure
found
on page 19.
18