3
Preparation
Before starting the installation process for the nBox, ensure that the following requirements have been met:
– Connections for the voltage supply to the nBox system are available on site in accordance with the technical data in
the appendix and the circuit diagrams.
–
The mains fuse provided on site is open.
– There are no batteries in the battery space (condition on delivery).
Preparatory measures
Before connecting the individual devices of your nBox system, carry out the following preparatory measures:
w
Open the nBox.
w
Remove the AC module.
Note
i
Detailed information on assembly and installation can be found in the system installation instructions.
Preparation
nBox, Quick commissioning 2.0 | 07.2022 | en
Preparation
EN
Done
7