Descargar Imprimir esta página

Zumtobel nBOX Serie Puesta En Operación Rápida página 29

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 46
3
Preparation
Before starting the installation process for the nBox, ensure that the following requirements have been met:
– Connections for the voltage supply to the nBox system are available on site in accordance with the technical data in
the appendix and the circuit diagrams.
The mains fuse provided on site is open.
– There are no batteries in the battery space (condition on delivery).
Preparatory measures
Before connecting the individual devices of your nBox system, carry out the following preparatory measures:
w
Open the nBox.
w
Remove the AC module.
Note
i
Detailed information on assembly and installation can be found in the system installation instructions.
Preparation
nBox, Quick commissioning 2.0 | 07.2022 | en
Preparation
EN
Done
7

Publicidad

loading

Productos relacionados para Zumtobel nBOX Serie

Este manual también es adecuado para:

Nbox sNbox lNbox ocm elp22 171 15022 171 15122 171 152