11
Initial check
Note
i
An initial check must be performed in accordance with local and national regulations before the
commissioning wizard is started. More information on the individual steps can be found in the nBox user
manual.
Note
i
To test the output circuits and locate the connected luminaires, hold down the test key for the output
circuit in question on the nBox for 1 to 3 seconds.
Perform initial check
nBox, Quick commissioning 2.0 | 07.2022 | en
Initial check
EN
Done
19