INSTALL
THE DUCTWORK
NOTE: To reduce the risk of fire, use only
metal ductwork.
1. Decide
where
the ductwork
wilt
run
between the hood and the outside.
2. A straight, short duct run wilt allow the hood
to perform most efficiently.
3. Long duct runs, elbows, and transitions will
reduce the performance
of the hood. Use
as few of them as possible. Larger ducting
may be required for best performance with
longer duct runs.
4. Install a roof or walt cap. Connect round
metal ductwork to cap and work back to-
wards hood location. Use duct tape to seal
the joints between ductwork sections.
INSTALL
MOUNTING
BRACKETS
1. Construct wood wall framing
that is flush
with interior
surface of wall studs.Make
sure:
a) the framing is centered over installation
location.
b) the height of the framing wilt allow the
mounting
brackets
to be secured to
the framing
within
the dimensions
shown.
2. Afterwall surface is finished secure mount-
ing brackets to framing using dimensions
shown.
FRAMING BEHIND DRYWALL
29-9/16"
= bottom
of hood 24"above
cookt(
35-9/16"=
bottom
of hood 30" above cooktop
-5-