5.5. METER AND CT CONNECTION.
5.5.1. Steps for connecting the power of the ESM1
90D24 EQX2 meter.
The ESM1 90D24 EQX2 meter must be connected to the installa-
tion's connection so that it can read its voltage. Connect to holes 1
and 4 as indicated below:
Fig. 61. Connecting the power of the ESM1 90D24 EQX2 meter.
5.5.2. Steps for connecting the CT to the ESM1
90D24 EQX2 meter.
In order for the meter to read the current that circulates through the
installation, the transformer (CT) must be connected in the direc-
tion indicated by the arrow inside the housing: from the loads to the
grid. Install it at the same point where the voltage is read.
78
Fig. 62. View of the CT transformer connections.
Installation steps:
Open the CT.
1.
The current transformer must be installed right after the IGA.
2.
Pass the network cable in the direction of the current, as shown
3.
with the arrow: of the installation
Close the CT.
4.
5.5.3. Steps for the connection of communications
between meter and inverter.
The communications cable required for connection to the meter is
connected to the inverter at the factory. It is identified as METER.
If you have accidentally disconnected it or need to connect a longer
one, etc., unscrew the protective casing, pass it through the left
cable gland that is labelled METER and connect it to the RJ45 port
labelled with the same name.
Fig. 63. Identification of the RJ45 port on the inverter.
(P1)
to the grid (P2).