Installation: Log Rest
Hole #1
NOTE:
The log rests and the log dog can be positioned
at your convenience. The locations shown in this
page are just a recommendation for an average
size log.
EN–6
Install the log rest assembly to the cross
bunk, using the 3/8" nut (item #3). See
illustration for location.
Step 11:
Install log dog at hole #18 & 19.
NOTE:
The Log Loader mounting
bracket should be installed at
this time using 3/8" x 2 1/2"
bolt (Item 5). (If purchased.)