Installation
Instructions
DUCTWORK INSTALLATION
(Note: For planning
purposes
only.)
[]
INSTALLING THE DUCTWORK
Use galvanized
or aluminum
duct in 6" round or
31/4" x 10" size, or a combination
of both.
PVC duct should be used if installing under a poured
concrete slab.
NOTE: Local building code must be followed
in
specifying
approved
type and schedule of ALL
duct used.
Always use an appropriate roof or wall cap with
damper. Laundry-type wall caps should NEVER
be used.
Through Cabinet Toe Space
BetweenFloorJoist
Downward Venting
Install ductwork,
making male-female
connections
in the direction of airflow as shown. Secure all joints
with sheet metal screws and duct tape to assure an
airtight seal.
Use the shortest and straightest
duct run possible.
Air Flow
-_
uct TapeOverSeam
andScrew
Screw
For satisfactory
performance,
the duct run should
not exceed 100 feet equivalent
length. Refer to the
"DUCTWORK CALCULATIONS" chart for equivalent
lengths. Use this chart to calculate
the total
equivalent
length of the ductwork.
OPTIONAL INSTALLATION:
REAR WALL VENTING
5" round duct may be used on SHORT DUCT runs,
but best results will be obtained
using 31/4" x 10"
or 6" round ducting.
InsideWall to Roof
Direct to Outside
RearWall Venting
To convert
blower exhaust direction, remove four
nuts behind the filter which hold blower and wire
finger guard.
Rotate blower and reinstall to vent chamber, as
shown above. Retighten nuts, but do not overtighten.