Descargar Imprimir esta página

Thermador UCVM Serie Manual De Instalación página 11

Ocultar thumbs Ver también para UCVM Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

15½"
CL
Point "P"
Fig. 8
Step 3: Prepare
Duct Cutouts
in
Cabinet
[] A. Refer to Figure 8. Drop a pIumbqine
from Point "P" at the rear center of the
countertop cutout. Mark this point on the
bottom of the cabinet below. Construct
two reference lines through this point:
one should be parallel to the cabinet
front and directly below the rear counter-
top cutout (Line A-A), and the other (Line
B-B) should be at right angles to A-A.
[] B. Using these reference lines as a base
for the measurements, layout the neces-
sary cabinet cutouts needed to imple-
ment the planned ductwork route. Where
a range of measurements is noted,
choose a measurement that allows best
clearance from wall studs, floor joists,
utilities, or other obstructions.
[] C. Before cutting for ducting, temporarily
set intake and cooktop in place and
attach integral blower (or duct transition
fitting if a remote or inline blower is instal-
led). Refer to steps 6 and 7. Verify that
the duct cutouts as marked will match
the hardware installation. Adjust the duct
cutout as necessary to match hardware
installation.
[] D. Remove temporarily placed hardware
and make cutouts in cabinet to accom-
modate ductwork installation.
[] E. Make all other cabinet modifications
needed to provide proper clearances for
drawers or removable shelving.
Note: Check boxes as tasks are completed.
11

Publicidad

loading