Descargar Imprimir esta página

Kohler Oblo K-123B16-SANA-CP Instrucciones De Instalación página 15

Publicidad

Idiomas disponibles

Idiomas disponibles

10. Install the AC Multi-Output Supply
AC Gang
Supply
IMPORTANT! The area in front of the sensor must be free of objects during the 2
minute learning cycle or the faucet may not function properly.
NOTE: If a hard wired installation is required, refer to "Hard Wire Installation".
Mount the AC supply under the deck using the two screws provided. Orient as
shown.
Remove the cover.
Connect the faucet wire to the faucet. Maintain a drip loop when connecting.
If needed, cut and strip the AC supply wires to length.
Connect the stripped ends to the bottom terminal block in the supply box.
Secure the terminal box cover to the terminal box.
Plug the AC supply into an unswitched 120 VAC electrical outlet.
Secure any excess wire under the deck.
Allow 2 minutes for the sensor to cycle through the automatic sensing distance.
Kohler Co.
Black
Red
15
AC Supply
Cable
1561536-2-A

Publicidad

loading

Este manual también es adecuado para:

Loure k-123l36-sanl-cp