Installation - Fagor PBZ6VI501FTB6S6C Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION

Making the worktop recess
Worktop thickness should be 28 - 40 mm, while its width at least 600 mm. The worktop
must be flat and level. Edge of the worktop near the wall must be sealed to prevent ingress
of water or other liquids.
● The distance between the edge of the opening and the edge of worktop should be at least
50 mm in front and rear.
● Prepare opening in the worktop with dimensions shown on the assembly drawing (Figure
A).
● Leave space of at least 50 mm between the appliance and adjacent cabinet walls.
● The height of the induction hob to be installed is 50 mm.
● If the cabinet has a horizontal protective panel below the hob installed in the worktop then
then there must be at least 25 mm of free space between the bottom of the hob and the
protective panel to ensure unrestricted air circulation. The minimum distance from the
induction hob must be 75 mm.
● Worktop must be made of materials, including veneer and adhesives, resistant to a tem-
perature of 100°C. Otherwise, veneer could come off or surface of the worktop become
deformed.
● Edge of the opening should be sealed with suitable materials to prevent ingress of water.
● A ventilation opening at least 80 mm in width should be made at the rear of the protective
panel.
● Suitable cross-section of the cord should be selected depending on the appliance rated
power (this should be performed by a skilled installer).
● Using an electrical cord, connect the hob according to electrical diagram provided.
● Remove dust from the worktop, insert hob into the opening and press in firmly (Figure B).
43

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido