CONNECT
DUCTWORK
Ductfree Configuration
1. Use screws and wall anchors (sup-
plied) to secure the upper bracket
to wall and ceiling as shown.
2. Turn upper flue section upside down
so air vents are at the top. Slide up-
per flue section into lower flue sec-
tion.
3. Snap the plastic duct collar intothe
hole in the bottom of the ducfree ple-
num. Connect the ductfree plenum
to the upper flue section with (4) flat-
head screws (supplied).
4. Measure the distance from the top
of the discharge
collar to the ceil-
ing. Cut a length of 6" round metal
duct 6" shorter than this dimension.
5. Fit duct section over the plastic duct
collar. For best fit, make sure duct
seam is toward the front.
UPPER
FLUE SECTION
UPPER
_(
AIR
BRACKET
In uppVEIIN,TeSsection)/
DUCTFRE
W
PLENUM
_-_'_-'_,_
IIll
PLAST,C
DUCTCOLLAR
\
AS,RE
LO_ER_I_\_
_I\
FLUE SECTI
6" ROUND
.ETALDUCT
D,SCHAROE
7------=
COLLAR
/
6. Set duct/flue assembly on hood with top tilted away from wall. Reach around flue
to engage bottom of duct with discharge collar on hood. Tilt flue up against wall.
Upper flue section can be cut to length if necessary.
7. Raise upper flue section and screw it to upper bracket with (2) screws (supplied).
Screw lower flue section to hood with screws (supplied).
DUCTFREE
FILTER
INSTALLATION
1. Purchase a ductfree filter kit (ROUND
FILTER) from your dealer.
2. Position the filters over the mounting
brackets on the blower inlet.
Rotate to lock filters in place.
-5-