Descargar Imprimir esta página

voestalpine Bohler welding TERRA NX 320 MSE Manual De Instrucciones página 40

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 118
INSTALLATION
1.9 Disposal
EN
»
2. INSTALLATION
2.1 Lifting, transport & unloading
2.2 Positioning of the equipment
Keep to the following rules:
2.3 Connection
The equipment is provided with a power supply cable for connection to the mains.
The system can be powered by:
• three-phase 400V
Operation of the equipment is guaranteed for voltage tolerances up to ±15% with respect to the rated value.
earth contact.
sets is recommended.
36

Publicidad

loading

Este manual también es adecuado para:

Bohler welding terra nx 400 mseBohler welding terra nx 500 ms