Descargar Imprimir esta página

Steelcase Migration LTD Instrucciones De Uso página 26

Publicidad

Idiomas disponibles

Idiomas disponibles

5 Operating and adjusting
Prior to putting the desk in service, it is necessary to
perform a manual reset. For the Up/Down control
panel, see Up/Down control panel below for the
Memory control panel, see Memory control panel on
page 28.
5.2.2 Up/Down control panel
The control panel is located on the left- or right-hand side, on
the underside of the desktop.
EN
Up/Down control panel version
26
}
Insert the mains plug into a power point supplying
220/230 V.

Publicidad

loading