Supplies Required - Bradley Halo S19314 Serie Instrucciones De Instalación

Ocultar thumbs Ver también para Halo S19314 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

S19314

Supplies Required:

(3)
" floor anchors and bolts
3
8
Teflon tape and pipe sealant
30 PSI (2.0 bar) min/90 PSI (6.1 bar) max flow pressure
125 PSI (8.6 bar) max static pressure
Piping to 1¼" NPT (BSPP) water supply inlet (30–90 psi [2.0-6.1 bar])
Piping to 1¼" NPT drain outlet on unit (if included with unit)
Adequate supply pipe supports
Provisions to dispose of shower waste water (minimum 30 gallons [115 liters]) should be made (minimum 4" [102mm]
drain.
OPTIONAL: sign-mounting hardware
Local codes may require the installation of a backflow prevention valve to complete proper installation. Valve must be
tested annually to verify that it is functioning properly. Backflow prevention valves are not included with the fixture and
may be supplied by the contractor or purchased from Bradley Corporation.
4
1/25/2024
Bradley • 215-1684 Rev. X: ECO 23-05-001A
Installation

Publicidad

Tabla de contenido
loading

Tabla de contenido